Industries / Architecture practices
How your designs evolved, sheet by sheet
RFIs, coordination notes and drawing revisions show a design growing from first sketch to construction set. Labs are looking for exactly that history. Client-owned designs can be excluded.
Check my estimateRecords that help
What usually qualifies
You pick which of these are in. Leaving any of them out is always fine.
- Coordination logsWhich clashes came up, and how the team resolved them.
- Revisions and drawing setsHow a design progresses from schematics to construction documents.
- RFIs and responsesHow designers and builders resolve questions from the field.
- Consultant correspondenceHow scope, fees and changes are worked through with consultants.
The question we hear most: drawing ownership
In some contracts, the drawings belong to the client. Client-owned material is reviewed during scoping and can be excluded project by project. If a contract leaves you unsure, that question goes to your counsel.
Projects such as government or critical buildings can carry security limits on drawings and site information. Those can be left out completely.
How the copy is made
An NDA is in place from the start. The de-identified copy swaps clients, consultants and staff for placeholders. Before anything is sent you approve a sample, and your original files remain on your servers.
In brief
Three things owners ask
Must we include BIM models?
No. RFIs, correspondence and revision history can be enough.
Can a single client stay out completely?
Yes. Name any client, project or folder and it stays out.
Is there any cost to us?
No. There is no cost to you, and asking for an estimate does not commit you to anything.